Material consumption against approved standard
BOM says two pieces. Production says three. The variance sheet says discuss.
Tested Claude Opus 5.5, medium effort · 15 Nov 2026 · on the practice files
Prepare job material rows
Use job, SKU, output qty, approved BOM per unit and actual consumed. Same material unit.
Privacy Remove bank account numbers, PAN, personal phone numbers and emails. Use vendor business names or codes, item codes and approved commercial details.
Period: [Period] Variance rule: [Variance rule] I'm attaching consumption.xlsx. A. Calculate standard usage and variance per row; hold missing values. B. List excess, under and exact; group by SKU/unit, no mixed-unit total. C. Questions for production about variance; no guessed cause. Use only supplied facts, quotes and approved terms. Flag missing GST, freight, payment days or delivery instead of assuming. Check stock against physical count or software before ordering. A person checks before sending, ordering, paying or posting.
Which model? Use your tool's strongest model with thinking turned on.
In your AI tool: attach the files with the + button, paste, send.
Keep your actual records in your own workbook; ask AI for the local method using headings and rules only.
Excel A:E job, SKU, output, standard usage per unit, actual usage. Rule [Variance rule]. Give formulas for standard usage, actual minus standard and status, hold missing inputs. Group by SKU and verified unit; avoid mixing unlike units. No automatic inventory adjustment. Tell me exactly where to paste formulas or set up the local steps. Use fictional examples only; do not ask for actual company records.
Run the method locally; check every exception against physical stock, contracts or source records as applicable, and obtain approval before acting.
- J15 excess. 10 × 2 = 20; actual 25.
- J32 under. 10 standard, actual 8.
- J4BOM missing. Hold variance.
Then send this: Recalculate all standards and variances; check missing row excluded.
Invents BOM
Reply: "Hold missing."
Claims wastage cause
Reply: "Variance only; ask production."
Mixes units
Reply: "Group SKU/unit."
Sir ne bola urgent. Ab bolo: ho gaya.
Did it work?
Doing this every week? Save it once.
Save the prompt in your AI tool, so next time you only drop the files in. Pick your tool at the top to see how.
What is that?
A Project is a folder in ChatGPT that keeps your instructions and files for every chat inside it. It's on the free plan too. Checked 14 Nov 2026.
What is that?
A Project in Claude is a workspace with its own instructions and files that every chat inside it uses. Checked 14 Nov 2026.
What is that?
A Gem is a custom Gemini that loads your instructions before every chat. Free on every plan; you create it on a computer. Checked 14 Nov 2026.
What is that?
Signed in with a work account, Microsoft's Copilot Chat applies enterprise data protection: your prompts aren't used to train its models. Checked 14 Nov 2026.
If your whole team does this, we'll set it up for all of them in one session.